|
7th Edition FBC (2020)
| |
| |
|
EARLY POWER LETTER REC'D
| |
8/9/2022 8:52:00 AM
| slkling |
|
ENGINEER ELEVATION CERTIFICATION
| |
6/14/2022 3:35:00 PM
| amcbroom |
|
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL
| |
3/24/2022 2:27:48 PM
| amcbroom |
|
IMPACT FEE DUE
| 22-041935 |
6/22/2022 10:05:38 AM
| dwint |
|
INFO NOC-
| 5544//627 |
4/25/2022 4:23:56 PM
| alosco |
|
LANDSCAPE INSPECTION REQ
| |
11/14/2022 10:00:35 AM
| |
|
LOT GRADING INSP REQ PRIOR C/O
| |
11/16/2022 10:57:57 AM
| |
|
METER CAN INSPECTION
| |
8/9/2022 8:56:39 AM
| air |
|
PAID UTILITY RECEIPT REQUIRED
| SJCUD |
7/29/2022 3:35:53 PM
| kturner |
|
SOLID WASTE FEE DUE
| 22-023875 |
4/11/2022 9:25:51 AM
| kcoop |
|
TERMITE BOND CO
| TURNER;WOOD |
4/11/2022 9:25:30 AM
| kcooper |
|
TERMITE PROTECTION CERT OF COMPL
| |
7/13/2022 10:23:27 AM
| slkling |