|
7th Edition FBC (2020)
| |
| |
|
EARLY POWER LETTER REC'D
| |
8/10/2022 9:04:30 AM
| slkling |
|
ENGINEER ELEVATION CERTIFICATION
| |
6/1/2022 1:03:26 PM
| dwintons |
|
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL
| |
9/22/2022 10:21:25 AM
| BOCC |
|
IMPACT FEE DUE
| 22-047365 |
7/15/2022 1:13:33 PM
| dwint |
|
INFO NOC-
| BK:5537 PG:1215 |
4/18/2022 10:14:53 AM
| bmsmith |
|
LANDSCAPE INSPECTION REQ
| |
12/7/2022 2:01:12 PM
| |
|
LOT GRADING INSP REQ PRIOR C/O
| |
12/7/2022 2:01:16 PM
| |
|
METER CAN INSPECTION
| |
8/10/2022 8:48:48 AM
| air |
|
PAID UTILITY RECEIPT REQUIRED
| SJCUD |
7/29/2022 3:54:29 PM
| kturner |
|
SOLID WASTE FEE DUE
| 22-023820 |
4/11/2022 7:36:35 AM
| kcoop |
|
TERMITE BOND CO
| TURNER;WOOD |
4/11/2022 7:36:07 AM
| kcooper |
|
TERMITE PROTECTION CERT OF COMPL
| |
7/11/2022 4:21:34 PM
| slkling |