|
7th Edition FBC (2020)
| |
| |
|
EARLY POWER LETTER REC'D
| |
8/9/2022 8:52:41 AM
| slkling |
|
ENGINEER ELEVATION CERTIFICATION
| |
6/14/2022 3:34:47 PM
| amcbroom |
|
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL
| |
3/24/2022 2:19:42 PM
| amcbroom |
|
IMPACT FEE DUE
| 22-047360 |
7/15/2022 1:08:43 PM
| dwint |
|
INFO NOC-
| 5544//626 |
4/25/2022 4:21:49 PM
| alosco |
|
LANDSCAPE INSPECTION REQ
| |
11/7/2022 8:20:24 AM
| |
|
LOT GRADING INSP REQ PRIOR C/O
| |
11/9/2022 9:34:13 AM
| |
|
METER CAN INSPECTION
| |
9/8/2022 8:32:29 AM
| air |
|
PAID UTILITY RECEIPT REQUIRED
| SJCUD |
7/29/2022 3:35:01 PM
| kturner |
|
SOLID WASTE FEE DUE
| 22-023779 |
4/8/2022 4:01:59 PM
| kcoop |
|
TERMITE BOND CO
| TURNER;WOOD |
4/8/2022 4:01:27 PM
| kcooper |
|
TERMITE PROTECTION CERT OF COMPL
| |
7/13/2022 10:22:58 AM
| slkling |