|
7th Edition FBC (2020)
| |
| |
|
EARLY POWER LETTER REC'D
| |
10/7/2022 12:17:02 PM
| slkling |
|
ENGINEER ELEVATION CERTIFICATION
| |
9/6/2022 9:48:03 AM
| mthomas |
|
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL
| |
3/30/2022 8:28:22 AM
| BOCC |
|
IMPACT FEE DUE
| 22-076786 |
12/13/2022 12:36:31 PM
| kalle |
|
INFO NOC-
| BK 5612 PG 1532 |
8/9/2022 9:57:01 AM
| slkling |
|
LANDSCAPE INSPECTION REQ
| |
12/27/2022 1:59:59 PM
| |
|
LOT GRADING INSP REQ PRIOR C/O
| |
1/5/2023 2:17:52 PM
| |
|
METER CAN INSPECTION
| |
10/6/2022 9:14:43 AM
| air |
|
PAID UTILITY RECEIPT REQUIRED
| JEA |
10/13/2022 1:21:05 PM
| clschmermund |
|
SOLID WASTE FEE DUE
| 22-023591 |
4/8/2022 11:03:53 AM
| kcoop |
|
TERMITE BOND CO
| TURNER;BAIT |
4/8/2022 11:03:33 AM
| kcooper |
|
TERMITE PROTECTION CERT OF COMPL
| |
1/18/2023 10:44:52 AM
| bshugart |