|
7th Edition FBC (2020)
| |
| |
|
EARLY POWER LETTER REC'D
| |
9/8/2022 9:37:52 AM
| slkling |
|
ENGINEER ELEVATION CERTIFICATION
| |
7/11/2022 3:53:43 PM
| dwintons |
|
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL
| |
3/15/2022 8:27:05 AM
| amcbroom |
|
IMPACT FEE DUE
| 22-047928 |
7/19/2022 11:20:51 AM
| dwint |
|
INFO NOC-
| 5572;1564 |
6/6/2022 10:53:31 AM
| bbonfanti |
|
LANDSCAPE INSPECTION REQ
| |
12/21/2022 8:48:17 AM
| |
|
LOT GRADING INSP REQ PRIOR C/O
| |
12/27/2022 1:08:43 PM
| |
|
METER CAN INSPECTION
| |
9/8/2022 9:14:59 AM
| air |
|
PAID UTILITY RECEIPT REQUIRED
| SJCUD |
9/16/2022 1:29:03 PM
| slkling |
|
SOLID WASTE FEE DUE
| 22-022747 |
4/6/2022 1:02:32 PM
| kcoop |
|
TERMITE BOND CO
| TURNER;WOOD |
4/6/2022 1:02:15 PM
| kcooper |
|
TERMITE PROTECTION CERT OF COMPL
| |
8/5/2022 3:05:48 PM
| slkling |