|
7th Edition FBC (2020)
| |
| |
|
EARLY POWER LETTER REC'D
| |
7/27/2022 10:58:26 AM
| cgalloway |
|
ENGINEER ELEVATION CERTIFICATION
| |
6/3/2022 8:03:40 AM
| dwintons |
|
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL
| |
1/24/2023 9:21:27 AM
| dwintons |
|
IMPACT FEE DUE
| 22-055580 |
8/22/2022 3:55:31 PM
| Lexis |
|
INFO NOC-
| 5521//34 |
4/5/2022 10:50:11 AM
| kcooper |
|
LANDSCAPE INSPECTION REQ
| |
1/23/2023 9:29:48 AM
| |
|
LOT GRADING INSP REQ PRIOR C/O
| |
1/13/2023 10:36:50 AM
| |
|
METER CAN INSPECTION
| |
7/28/2022 11:34:41 AM
| air |
|
PAID UTILITY RECEIPT REQUIRED
| JEA |
4/5/2022 10:50:02 AM
| kcooper |
|
SOLID WASTE FEE DUE
| 22-022411 |
4/5/2022 1:11:31 PM
| Lexis |
|
TERMITE BOND CO
| TURNER;BAIT |
4/5/2022 10:50:22 AM
| kcooper |
|
TERMITE PROTECTION CERT OF COMPL
| TURNER;BAIT |
1/17/2023 9:56:16 AM
| bmsmith |