|
7th Edition FBC (2020)
| |
| |
|
EARLY POWER LETTER REC'D
| |
9/8/2022 9:36:30 AM
| slkling |
|
ENGINEER ELEVATION CERTIFICATION
| |
7/11/2022 3:55:07 PM
| dwintons |
|
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL
| |
3/15/2022 8:31:39 AM
| amcbroom |
|
IMPACT FEE DUE
| 22-047926 |
7/19/2022 11:19:18 AM
| dwint |
|
INFO NOC-
| 5572;1565 |
6/6/2022 10:54:43 AM
| bbonfanti |
|
LANDSCAPE INSPECTION REQ
| |
12/21/2022 8:48:06 AM
| |
|
LOT GRADING INSP REQ PRIOR C/O
| |
12/27/2022 1:08:22 PM
| |
|
METER CAN INSPECTION
| |
8/18/2022 4:00:33 PM
| air |
|
PAID UTILITY RECEIPT REQUIRED
| SJCUD |
9/16/2022 1:32:44 PM
| slkling |
|
SOLID WASTE FEE DUE
| 22-020151 |
3/28/2022 1:14:30 PM
| kcoop |
|
TERMITE BOND CO
| TURNER;WOOD |
3/28/2022 1:14:14 PM
| kcooper |
|
TERMITE PROTECTION CERT OF COMPL
| |
1/5/2023 9:36:34 AM
| slkling |