|
7th Edition FBC (2020)
| |
| |
|
EARLY POWER LETTER REC'D
| |
9/14/2022 11:53:30 AM
| cgalloway |
|
ENGINEER ELEVATION CERTIFICATION
| |
4/14/2022 8:28:45 AM
| dwintons |
|
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL
| |
6/10/2022 2:46:31 PM
| BOCC |
|
IMPACT FEE DUE
| 22-060852 |
9/15/2022 11:58:38 AM
| nbrad |
|
INFO NOC-
| BK 5487 PG 1198 |
3/1/2022 3:12:12 PM
| slkling |
|
LANDSCAPE INSPECTION REQ
| |
2/1/2023 9:56:28 AM
| |
|
LOT GRADING INSP REQ PRIOR C/O
| |
2/1/2023 1:26:44 PM
| |
|
METER CAN INSPECTION
| |
9/15/2022 10:18:06 AM
| air |
|
PAID UTILITY RECEIPT REQUIRED
| SJCUD |
5/3/2022 7:46:15 AM
| bmsmith |
|
SOLID WASTE FEE DUE
| 22-013740 |
3/2/2022 9:48:02 AM
| bbonf |
|
TERMITE BOND CO
| TURNER;WOOD |
3/1/2022 1:36:40 PM
| kcooper |
|
TERMITE PROTECTION CERT OF COMPL
| |
2/17/2023 3:18:37 PM
| bshugart |