|
7th Edition FBC (2020)
| |
| |
|
EARLY POWER LETTER REC'D
| |
9/14/2022 11:52:09 AM
| cgalloway |
|
ENGINEER ELEVATION CERTIFICATION
| |
4/26/2022 9:47:06 AM
| dwintons |
|
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL
| |
6/10/2022 2:46:31 PM
| BOCC |
|
IMPACT FEE DUE
| 22-060854 |
9/15/2022 11:59:07 AM
| nbrad |
|
INFO NOC-
| BK 5509 PG 1568 |
3/11/2022 1:29:59 PM
| slkling |
|
LANDSCAPE INSPECTION REQ
| |
3/22/2023 9:35:02 AM
| |
|
LOT GRADING INSP REQ PRIOR C/O
| |
3/22/2023 12:48:20 PM
| |
|
METER CAN INSPECTION
| |
9/15/2022 10:13:34 AM
| air |
|
PAID UTILITY RECEIPT REQUIRED
| SJCUD |
5/3/2022 7:42:44 AM
| bmsmith |
|
SOLID WASTE FEE DUE
| 22-011570 |
2/22/2022 10:20:42 AM
| bmsmi |
|
TERMITE BOND CO
| TURNER; WOOD |
2/18/2022 10:57:04 AM
| ccontestabile |
|
TERMITE PROTECTION CERT OF COMPL
| |
5/18/2023 3:07:14 PM
| bshugart |