|
7th Edition FBC (2020)
| |
| |
|
EARLY POWER LETTER REC'D
| |
7/14/2022 1:00:41 PM
| slkling |
|
ENGINEER ELEVATION CERTIFICATION
| |
2/25/2022 3:35:04 PM
| dwintons |
|
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL
| |
6/10/2022 2:46:31 PM
| BOCC |
|
IMPACT FEE DUE
| 22-043700 |
6/29/2022 1:32:30 PM
| thowe |
|
INFO NOC-
| VK 5478 PG 1878 |
2/10/2022 10:10:46 AM
| slkling |
|
LANDSCAPE INSPECTION REQ
| |
10/26/2022 11:22:26 AM
| |
|
LOT GRADING INSP REQ PRIOR C/O
| |
10/3/2022 12:17:48 PM
| |
|
METER CAN INSPECTION
| |
7/15/2022 3:32:13 PM
| air |
|
PAID UTILITY RECEIPT REQUIRED
| SJCUD |
6/7/2022 8:05:21 AM
| bmsmith |
|
REINSPECTION FEE
| 22-071337 |
11/9/2022 12:22:35 PM
| khart |
|
REINSPECTION FEE
| 22-072259 |
11/16/2022 12:07:31 PM
| cgall |
|
SOLID WASTE FEE DUE
| 22-008743 |
2/9/2022 10:59:10 AM
| bmsmi |
|
TERMITE BOND CO
| TURNER; WOOD |
2/9/2022 10:01:03 AM
| ccontestabile |
|
TERMITE PROTECTION CERT OF COMPL
| |
11/9/2022 12:20:37 PM
| khart |