|
7th Edition FBC (2020)
| |
| |
|
EARLY POWER LETTER REC'D
| |
7/19/2022 4:00:41 PM
| slkling |
|
ENGINEER ELEVATION CERTIFICATION
| |
4/5/2022 8:57:14 AM
| dwintons |
|
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL
| |
6/10/2022 2:46:31 PM
| BOCC |
|
IMPACT FEE DUE
| 22-048060 |
7/19/2022 2:10:04 PM
| kalle |
|
INFO NOC-
| BK 5478 PG 1876 |
2/10/2022 10:08:28 AM
| slkling |
|
LANDSCAPE INSPECTION REQ
| |
12/20/2022 2:20:20 PM
| |
|
LOT GRADING INSP REQ PRIOR C/O
| |
12/20/2022 3:19:07 PM
| |
|
METER CAN INSPECTION
| |
7/20/2022 3:51:08 PM
| air |
|
PAID UTILITY RECEIPT REQUIRED
| SJCUD |
6/7/2022 7:41:14 AM
| bmsmith |
|
SOLID WASTE FEE DUE
| 22-008738 |
2/9/2022 10:56:40 AM
| bmsmi |
|
TERMITE BOND CO
| TURNER; WOOD |
2/9/2022 9:48:16 AM
| ccontestabile |
|
TERMITE PROTECTION CERT OF COMPL
| |
1/18/2023 3:19:16 PM
| bshugart |