|
7th Edition FBC (2020)
| |
| |
|
EARLY POWER LETTER REC'D
| |
5/27/2022 9:14:30 AM
| slkling |
|
ENGINEER ELEVATION CERTIFICATION
| |
3/1/2022 12:30:31 PM
| dwintons |
|
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL
| |
6/10/2022 2:46:31 PM
| BOCC |
|
IMPACT FEE DUE
| 22-036480 |
6/1/2022 9:39:01 AM
| kalle |
|
INFO NOC-
| BK 5493 PG 1357 |
2/15/2022 4:02:12 PM
| slkling |
|
LANDSCAPE INSPECTION REQ
| |
11/30/2022 12:40:24 PM
| |
|
LOT GRADING INSP REQ PRIOR C/O
| |
11/21/2022 1:21:41 PM
| |
|
METER CAN INSPECTION
| |
5/25/2022 12:22:10 PM
| air |
|
PAID UTILITY RECEIPT REQUIRED
| SJCUD |
6/7/2022 8:06:11 AM
| bmsmith |
|
SOLID WASTE FEE DUE
| 22-008716 |
2/9/2022 10:41:07 AM
| bmsmi |
|
TERMITE BOND CO
| TURNER; WOOD |
2/9/2022 8:23:13 AM
| ccontestabile |
|
TERMITE PROTECTION CERT OF COMPL
| |
12/20/2022 10:57:18 AM
| slkling |