|
7th Edition FBC (2020)
| |
| |
|
EARLY POWER LETTER REC'D
| |
6/8/2022 10:11:56 AM
| slkling |
|
ENGINEER ELEVATION CERTIFICATION
| |
3/22/2022 3:43:45 PM
| dwintons |
|
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL
| |
6/10/2022 2:46:31 PM
| BOCC |
|
IMPACT FEE DUE
| 22-059007 |
9/7/2022 1:10:20 PM
| kalle |
|
INFO NOC-
| BK 5493 PG 1353 |
2/15/2022 4:00:31 PM
| slkling |
|
LANDSCAPE INSPECTION REQ
| |
1/6/2023 10:29:49 AM
| |
|
LOT GRADING INSP REQ PRIOR C/O
| |
1/6/2023 1:58:45 PM
| |
|
METER CAN INSPECTION
| |
6/8/2022 1:08:50 PM
| air |
|
PAID UTILITY RECEIPT REQUIRED
| SJCUD |
5/3/2022 7:41:08 AM
| bmsmith |
|
SOLID WASTE FEE DUE
| 22-008718 |
2/9/2022 10:42:47 AM
| bmsmi |
|
TERMITE BOND CO
| TURNER;WOOD |
2/9/2022 8:14:41 AM
| ccontestabile |
|
TERMITE PROTECTION CERT OF COMPL
| |
2/21/2023 8:16:46 AM
| ccontestabile |