|
7th Edition FBC (2020)
| |
| |
|
BAY WIND/FPLACE/EAVES/MAX 3 FT. PROJECTION
| |
| |
|
EARLY POWER LETTER REC'D
| |
5/4/2023 8:45:13 AM
| ccontestabile |
|
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL
| |
10/12/2021 11:19:25 AM
| amcbroom |
|
IMPACT FEE DUE
| 23-023341 |
5/1/2023 2:28:06 PM
| Lexis |
|
INFO NOC-
| BK 5497 PG 1619 |
2/22/2022 4:05:47 PM
| slkling |
|
LANDSCAPE INSPECTION REQ
| |
5/19/2023 8:27:09 AM
| |
|
LOT GRADING INSP REQ PRIOR C/O
| |
5/19/2023 1:49:18 PM
| |
|
METER CAN INSPECTION
| |
5/4/2023 3:36:46 PM
| air |
|
PAID UTILITY RECEIPT REQUIRED
| COSA / WATER ONLY |
5/25/2023 2:07:30 PM
| cgalloway |
|
SEPTIC TANK FINAL REQ
| |
6/6/2023 10:24:38 PM
| ehealth |
|
SOLID WASTE FEE DUE
| 23-023345 |
5/1/2023 2:33:26 PM
| Lexis |
|
SWALE/CULVERT FINAL INSP REQ
| |
5/23/2023 7:05:25 AM
| air |
|
TERMITE BOND CO
| NADER'S / BAIT |
2/2/2022 10:06:05 AM
| krobshaw |
|
TERMITE PROTECTION CERT OF COMPL
| |
6/7/2023 3:05:52 PM
| bshugart |