7th Edition FBC (2020)
| |
| |
|
BAY WIND/FPLACE/EAVES/MAX 3 FT. PROJECTION
| |
| |
|
EARLY POWER LETTER REC'D
| |
7/22/2022 9:49:22 AM
| kcooper |
|
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL
| |
11/15/2021 3:41:25 PM
| kallen |
|
IMPACT FEE DUE
| 22-048901 |
7/22/2022 10:45:08 AM
| Lexis |
|
INFO NOC-
| 5432//1825 |
12/6/2021 11:11:17 AM
| bshugart |
|
LANDSCAPE INSPECTION REQ
| |
10/5/2022 3:50:37 PM
| |
|
LOT GRADING INSP REQ PRIOR C/O
| |
10/5/2022 9:35:09 AM
| |
|
METER CAN INSPECTION
| ENERGIZE INSPECTION APPROVED |
7/27/2022 9:02:20 AM
| kcooper |
|
SEPTIC TANK FINAL REQ
| |
9/7/2022 9:47:55 PM
| ehealth |
|
SOLID WASTE FEE DUE
| 22-048901 |
7/22/2022 10:45:08 AM
| Lexis |
|
SWALE/CULVERT FINAL INSP REQ
| |
10/11/2022 7:32:36 AM
| air |
|
TERMITE BOND CO
| FL PEST; SLAB |
12/6/2021 11:11:49 AM
| bshugart |
|
TERMITE PROTECTION CERT OF COMPL
| |
10/5/2022 1:39:49 PM
| slkling |
|
INSPECTOR TO VERIFY WATER/ WELL AT FINAL
| |
9/30/2022 9:26:19 AM