|
7th Edition FBC (2020)
| |
| |
|
EARLY POWER LETTER REC'D
| |
4/1/2022 10:25:50 AM
| slkling |
|
ENGINEER ELEVATION CERTIFICATION
| |
2/24/2022 1:01:13 PM
| dwintons |
|
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL
| |
5/19/2022 3:27:13 PM
| BOCC |
|
HOLD CO FOR PRIVATE PROVIDER CERT OF COMPLIANCE
| |
12/8/2022 11:00:03 AM
| slkling |
|
IMPACT FEE DUE
| 22-020348 |
3/29/2022 8:10:42 AM
| dwint |
|
INFO NOC-
| BK 5430 PG 34 |
12/2/2021 1:15:51 PM
| slkling |
|
LANDSCAPE INSPECTION REQ
| |
11/17/2022 12:24:15 PM
| |
|
LOT GRADING INSP REQ PRIOR C/O
| |
11/17/2022 1:40:55 PM
| |
|
METER CAN INSPECTION
| |
10/17/2022 3:11:36 PM
| Priv Povider |
|
PAID UTILITY RECEIPT REQUIRED
| JEA |
5/6/2022 10:39:59 AM
| kcooper |
|
SOLID WASTE FEE DUE
| 21-076849 |
11/29/2021 9:16:03 AM
| kcoop |
|
TERMITE BOND CO
| TURNER;BAIT |
11/29/2021 9:15:30 AM
| kcooper |
|
TERMITE PROTECTION CERT OF COMPL
| |
12/7/2022 2:17:15 PM
| slkling |