|
7th Edition FBC (2020)
| |
| |
|
EARLY POWER LETTER REC'D
| |
4/11/2022 9:58:35 AM
| slkling |
|
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL
| |
6/18/2021 7:36:41 AM
| tsteven |
|
IMPACT FEE DUE
| 22-022414 |
4/5/2022 1:17:48 PM
| dwint |
|
INFO NOC-
| 5405;1194 |
10/28/2021 11:29:07 AM
| bbonfanti |
|
LANDSCAPE INSPECTION REQ
| |
4/6/2022 11:18:37 AM
| |
|
LOT GRADING INSP REQ PRIOR C/O
| |
4/7/2022 1:31:49 PM
| |
|
METER CAN INSPECTION
| |
4/7/2022 11:08:52 AM
| air |
|
SEPTIC TANK FINAL REQ
| |
4/19/2022 11:28:59 AM
| ehealth |
|
SOLID WASTE FEE DUE
| 22-022414 |
4/5/2022 1:17:48 PM
| dwint |
|
SWALE/CULVERT FINAL INSP REQ
| |
4/7/2022 7:49:19 AM
| air |
|
TERMITE BOND CO
| FLORIDA PEST; SOIL |
10/26/2021 1:13:10 PM
| ccontestabile |
|
TERMITE PROTECTION CERT OF COMPL
| |
4/12/2022 11:27:14 AM
| slkling |
|
VERIFY WATER ON SITE AT FINAL
| |
4/19/2022 11:32:27 AM
| cgalloway |