7th Edition FBC (2020)
| |
| |
|
EARLY POWER LETTER REC'D
| |
7/27/2022 11:00:28 AM
| cgalloway |
|
ENGINEER ELEVATION CERTIFICATION
| |
7/11/2022 4:24:51 PM
| dwintons |
|
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL
| |
8/26/2021 9:18:57 AM
| BOCC |
|
IMPACT FEE DUE
| 22-053798 |
8/15/2022 9:30:09 AM
| Lexis |
|
INFO NOC-
| 5318//1424 |
7/15/2021 1:06:04 PM
| kcooper |
|
LANDSCAPE INSPECTION REQ
| |
10/28/2022 12:53:09 PM
| |
|
LOT GRADING INSP REQ PRIOR C/O
| |
10/28/2022 12:25:37 PM
| |
|
METER CAN INSPECTION
| |
7/28/2022 10:26:23 AM
| air |
|
PAID UTILITY RECEIPT REQUIRED
| SJCUD |
7/14/2021 9:04:32 AM
| slhersey |
|
SOLID WASTE FEE DUE
| 21-045321 |
7/14/2021 11:34:53 AM
| Lexis |
|
TERMITE BOND CO
| TURNER; BAIT |
7/14/2021 9:05:05 AM
| slhersey |
|
TERMITE PROTECTION CERT OF COMPL
| |
5/2/2023 4:04:46 PM
| bshugart |