7th Edition FBC (2020)
| |
| |
|
EARLY POWER LETTER REC'D
| |
6/7/2022 11:04:06 AM
| slkling |
|
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL
| |
1/28/2021 11:02:29 AM
| amcbroom |
|
IMPACT FEE DUE
| 22-038221 |
6/7/2022 1:54:41 PM
| dwint |
|
INFO NOC-
| 5164//392 |
9/14/2021 1:55:55 PM
| kcooper |
|
LANDSCAPE INSPECTION REQ
| |
6/23/2022 11:34:28 AM
| |
|
LOT GRADING INSP REQ PRIOR C/O
| |
6/23/2022 11:34:34 AM
| |
|
METER CAN INSPECTION
| |
6/6/2022 3:29:25 PM
| air |
|
PAID UTILITY RECEIPT REQUIRED
| COSA |
5/10/2021 11:01:03 AM
| krobshaw |
|
SOLID WASTE FEE DUE
| 22-038221 |
6/7/2022 1:54:41 PM
| dwint |
|
TERMITE BOND CO
| FLORIDA PEST / SOIL |
5/10/2021 11:01:22 AM
| krobshaw |
|
TERMITE PROTECTION CERT OF COMPL
| |
6/24/2022 4:07:38 PM
| slkling |
|
HOLD FINAL FOR SEPARATE METAL ROOF PERMIT
| P# 12204192 |
3/16/2022 11:16:54 AM
| khanson |
|
HOLD INSP 109 INSULATION FOR CORRECTED -
| ENERGY FORM, FLIPPED AND METAL ROOF. |
6/22/2022 12:29:46 PM
| jdacosta |