|
6th Edition FBC (2017)
| |
| |
|
EARLY POWER LETTER
| |
4/12/2021 8:58:17 AM
| kcooper |
|
ENGINEER ELEVATION CERTIFICATION
| |
11/12/2020 7:29:12 AM
| kallen |
|
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL
| |
10/2/2020 10:54:58 AM
| BOCC |
|
IMPACT FEE DUE
| 20-063747 |
11/17/2020 3:35:51 PM
| nbrad |
|
INFO NOC-
| 5043/1696 |
10/27/2020 9:45:10 AM
| cgalloway |
|
LANDSCAPE INSPECTION REQ
| |
4/27/2021 2:35:02 PM
| |
|
LOT GRADING INSP REQ PRIOR C/O
| |
5/11/2021 11:53:12 AM
| |
|
METER CAN INSPECTION
| |
4/9/2021 10:04:24 AM
| air |
|
PAID UTILITY RECEIPT REQUIRED
| JEA |
10/7/2020 10:05:06 AM
| ccontestabile |
|
PNZ SIGN OFF
| |
| |
|
SOLID WASTE FEE DUE
| 20-056379 |
10/13/2020 3:34:37 PM
| kcoop |
|
TERMITE BOND CO
| HOMETEAM; SOIL |
10/7/2020 10:04:58 AM
| ccontestabile |
|
TERMITE PROTECTION CERT OF COMPL
| |
5/6/2021 12:09:19 PM
| cgalloway |