6th Edition FBC (2017)
| |
| |
|
FEMA FORM REQUIRED
| AE-9. ELEVATED STRUCTURE. FINAL ONLY REQUIRED. |
8/22/2018 11:12:25 AM
| jdacosta |
|
HOLD C/O: ORIGINAL FINISHED CONST FEMA
| SUBSTANTIAL IMPROVMENT W/ ROOF MOD |
| |
|
IMPACT FEE DUE Zero Out
| |
5/11/2018 11:20:47 AM
| kallen |
|
INFO NOC-
| BK 4622 PG 1853 |
10/5/2018 11:31:40 AM
| bcalaman |
|
SEPTIC TANK FINAL REQ
| NO INSPECTION NEEDED FOR EXISTING SYSTEM PER BRANDON TIRADO |
8/31/2018 11:10:57 AM
| mkuehne |
|
TERMITE BOND CO
| FLPEST;SOIL |
8/23/2018 8:27:44 AM
| lhenry |
|
TERMITE PROTECTION CERT OF COMPL
| |
8/14/2019 9:12:03 AM
| cgalloway |