6th Edition FBC (2017)
| |
| |
|
Architectural approval required
| |
11/29/2018 12:17:31 PM
| ckeough |
|
Building Elevations Required
| |
11/29/2018 12:17:32 PM
| ckeough |
|
EARLY POWER LETTER REC'D
| 21804069 |
1/8/2019 2:53:45 PM
| cgalloway |
|
EARLY POWER LETTER REC'D
| |
11/28/2018 9:04:03 AM
| cgalloway |
|
ENERGIZE BLDG INSPECTION
| |
12/20/2018 2:12:50 PM
| |
|
ENERGIZE BLDG INSPECTION
| |
12/20/2018 2:12:50 PM
| |
|
FEMA FORM REQUIRED
| ENTIRELY I [X] A-U, AE-U, X-NA |
7/2/2018 2:30:39 PM
| fbecza |
|
HOLD 109 INSP FOR FIRE ALRM PRMT
| |
8/15/2018 12:22:18 PM
| VVitori |
|
HOLD 109 INSP FOR FIRE SPRNKLR PRMT
| |
10/25/2018 11:33:46 AM
| VVitori |
|
HOLD 109 INSP FOR UNDERGROUND PERMIT
| |
6/7/2018 10:02:40 AM
| SMurray |
|
HOLD BLDG FINAL INSP FOR FIRE MARSHAL FINAL.
| |
12/21/2018 12:20:24 PM
| |
|
HOLD C/O FOR SITE ASBUILT APPROV
| TCO UNTIL 03/04/2019 PER BPP |
2/1/2019 2:10:13 PM
| bpowelson |
|
HOLD C/O: ORIGINAL FINISHED CONST FEMA
| |
7/2/2018 2:30:44 PM
| fbecza |
|
IMPACT FEE DUE
| 18-062780 |
11/21/2018 8:55:38 AM
| hmast |
|
INFO NOC-
| BK 4560 PG 1183 |
6/8/2018 9:28:07 AM
| bcalaman |
|
LANDSCAPE INSPECTION REQ
| |
11/29/2018 8:52:30 AM
| |
|
PAID UTILITY RECEIPT REQUIRED
| JEA PRE ACCEPTANCE OR RECEIPT |
11/27/2018 2:29:20 PM
| cgalloway |
|
TERMITE BOND CO
| PROTEC SERVICES; SOIL |
6/6/2018 11:22:53 AM
| slhersey |
|
TERMITE PROTECTION CERT OF COMPL
| |
12/20/2018 10:11:46 AM
| bcalaman |
|
100 FOR ENGINEERED AWNING PLANS
| |
11/7/2018 7:23:08 AM
| fbecza |