6th Edition FBC (2017)
| |
| |
|
BAY WIND/FPLACE/EAVES/MAX 3 FT. PROJECTION
| |
| |
|
EARLY POWER LETTER
| |
4/23/2019 10:01:05 AM
| bcalaman |
|
EXISTING RESIDENCE TO BE REMOVED PRIOR TO C/O
| |
5/9/2019 4:14:08 PM
| cgalloway |
|
FEMA FORM REQUIRED
| AE-7, X-NA -OKAY PER JD |
6/14/2018 2:06:18 PM
| tcarroll |
|
HOLD C/O: ORIGINAL FINISHED CONST FEMA
| BFE - 4.0' DFE - 5.0' FFE - 7.4' |
5/1/2019 8:24:21 AM
| wwoodward |
|
IMPACT FEE DUE Zero Out
| |
12/20/2017 7:45:29 AM
| amcbroom |
|
IMPACT FEE REASSESSMENT NEEDED
| |
| |
|
INFO NOC-
| BK 4499 PG 33 |
2/5/2018 4:04:52 PM
| krobshaw |
|
LANDSCAPE INSPECTION REQ
| |
4/23/2019 4:08:07 PM
| |
|
LOT GRADING INSP REQ PRIOR C/O
| |
5/9/2019 4:10:21 PM
| |
|
METER CAN INSPECTION
| |
4/22/2019 9:45:20 AM
| |
|
SEPTIC TANK FINAL REQ
| |
5/2/2019 7:49:54 PM
| ehealth |
|
SOLID WASTE FEE DUE
| ALREADY ASSESSED |
2/5/2018 4:07:50 PM
| krobshaw |
|
TERMITE BOND CO
| PENINSULA /SOIL |
2/5/2018 4:05:15 PM
| krobshaw |
|
TERMITE PROTECTION CERT OF COMPL
| |
4/30/2019 11:21:47 AM
| bcalaman |
|
NO INSPECTIONS. 2017 ENGINEERED TRUSSES MUST BE REVIEWED FOR
| FOUNDATION INSPECTIONS |
3/15/2018 9:47:21 AM
| hkahler |
|
HOLD INSP 109 FOR ICC-ES REPORT FOR SPRAY FOAM INSULATION.
| |
10/8/2018 5:00:01 PM
| jdacosta |
|
HOLD FINAL FOR METAL ROOF PERMIT.
| 11816290 |
11/26/2018 11:42:01 AM
| mkuehne |