5th Edition FBC (2014)
| |
| |
|
5th Edition FBC (2014)
| |
| |
|
CSTL CONST DEP PERMIT NEEDED
| N/A BLDG LAYS WESTERLEY OF THE CCCL PER APPROVED SITE PLAN |
5/19/2017 9:55:58 AM
| blaw |
|
EARLY POWER LETTER REC'D
| |
1/4/2019 7:40:43 AM
| edegrande |
|
FEMA FORM REQUIRED
| VE-14, X-NA LHSM @ 26.8 NGVD 1929 |
8/28/2017 11:56:58 AM
| blaw |
|
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL
| |
2/6/2017 11:18:57 AM
| kallen |
|
HOLD C/O: ORIGINAL FINISHED CONST FEMA
| MUST PROVIDE V-ZONE DESIGN CERT |
1/2/2020 8:37:19 AM
| jadams |
|
IMPACT FEE DUE
| 18-067397 |
12/18/2018 11:25:17 AM
| hmast |
|
INFO NOC-
| BK 4364 PG 785 |
6/19/2017 2:37:47 PM
| krobshaw |
|
LANDSCAPE INSPECTION REQ
| |
12/9/2019 4:09:29 PM
| |
|
Lighting Ordinance 190 for inspection
| AMBER FILTERS NEED TO BE INSTALLED BY MAY 1 |
1/3/2020 10:06:50 AM
| |
|
LOT GRADING INSP REQ PRIOR C/O
| |
12/31/2019 9:45:43 AM
| |
|
METER CAN INSPECTION
| |
12/12/2018 11:13:39 AM
| air |
|
PAID UTILITY RECEIPT REQUIRED
| |
6/19/2017 2:30:34 PM
| krobshaw |
|
SOLID WASTE FEE DUE
| 18-067397 |
12/18/2018 11:25:17 AM
| hmast |
|
TERMITE BOND CO
| NADERS / SOIL |
6/19/2017 2:31:10 PM
| krobshaw |
|
TERMITE PROTECTION CERT OF COMPL
| |
10/25/2019 10:25:45 AM
| cgalloway |
|
HOLD ALL INSPECTIONS FOR LHSM ELEVATION CERTIFICATE
| LHSM @ 26.8 NGVD 1929 |
8/28/2017 11:56:23 AM
| blaw |
|
HOLD ALL INSPECTIONS FOR A PILE REPORT
| |
8/28/2017 11:56:19 AM
| blaw |
|
NIGHT TIME LIGHTING INSPECTION REQUIRED PRIOR TO CO
| SEE 1/3/2020 10:06:50 AM A NOTTER INSPECTION |
1/8/2020 11:28:27 AM
| tcarroll |
|
HOLD CO FOR FLAT ROOF PERMIT
| N/A |
12/18/2018 10:59:05 AM
| ehumphreys |
|
HOLD CO FOR TILE ROOF PERMIT
| |
1/30/2018 12:36:53 PM
| cgalloway |
|
HOLD CO FOR METAL ROOF PERMIT
| N/A |
12/18/2018 10:59:09 AM
| ehumphreys |