|
2010-FL BLDG CODE
| |
| |
|
EARLY POWER LETTER REC'D
| |
6/8/2016 11:19:50 AM
| cgalloway |
|
ENERGIZE BLDG INSPECTION
| |
6/8/2016 8:09:25 AM
| cgalloway |
|
FEMA FORM REQUIRED
| STRUCTURE NOT IN THE FLOOD ZONE |
2/29/2016 11:04:38 AM
| jschock |
|
HOLD BLDG FINAL INSP FOR FIRE MARSHAL FINAL.
| |
2/10/2017 1:56:39 PM
| |
|
HOLD C/O: ORIGINAL FINISHED CONST FEMA
| |
2/29/2016 11:05:02 AM
| jschock |
|
IMPACT FEE DUE
| N/A |
3/2/2015 1:31:09 PM
| cgalloway |
|
INFO NOC-
| BK 3974 PG 1480 |
3/2/2015 1:31:41 PM
| cgalloway |
|
LANDSCAPE INSPECTION REQ
| |
2/14/2017 7:40:25 AM
| |
|
100 FOR WELD / BOLT CERTIFICATION
| |
2/2/2017 8:58:03 AM
| smorsch |