|
2004-FL BLDG CODE
| |
| |
|
ENGINEER ELEVATION CERTIFICATION
| |
| |
|
FEMA FORM REQUIRED
| Fema U LOMR # 93-04 |
6/26/2007 12:00:00 AM
| CJG |
|
HOLD BLDG FINAL INSP FOR FIRE MARSHAL FINAL.
| |
| |
|
HOLD C/O: ORIGINAL FINISHED CONST FEMA
| |
| |
|
IMPACT FEE DUE
| |
| |
|
INFO NOC-
| or 2885 pg 700 |
3/19/2007 12:00:00 AM
| AHB |
|
LOT GRADING CERTIFICATION
| |
1/1/2008 12:00:00 AM
| sys |
|
LOT GRADING INSP REQ PRIOR C/O
| |
| |
|
METER CAN INSPECTION
| |
| |
|
PAID UTILITY RECEIPT REQUIRED
| |
| |
|
SOLID WASTE FEE DUE
| |
| |
|
TERMITE BOND CO
| HULLETT; SOIL METHOD |
9/13/2006 12:00:00 AM
| JO |
|
TERMITE PROTECTION CERT OF COMPL
| |
| |