7th Edition FBC (2020)
| |
| |
|
ALARM INSP REQ HOLD 109 FRAMING FOR GENERATOR PERMIT
| REVSION FOR GENERATOR AS FUTURE NOT IN CURRENT SCOPE |
6/14/2022 11:01:56 AM
| agedris |
|
EARLY POWER LETTER REC'D
| |
4/28/2022 9:57:27 AM
| cgalloway |
|
ENERGIZE BLDG INSPECTION
| DONE AS METER CAN |
5/13/2022 10:29:23 AM
| cgalloway |
|
HOLD 109 INSP FOR FIRE ALRM PRMT
| |
1/25/2022 11:10:16 AM
| dlyons |
|
HOLD 109 INSP FOR FIRE SPRNKLR PRMT
| |
10/20/2021 2:37:43 PM
| dlyons |
|
HOLD 109 INSP FOR UNDERGROUND PERMIT
| |
10/25/2021 2:16:18 PM
| VVitori |
|
HOLD BLDG FINAL INSP FOR FIRE MARSHAL FINAL.
| |
7/13/2023 7:39:38 AM
| |
|
HOLD C/O FOR SITE ASBUILT APPROV
| OK FOR TCO, THRU 11/18 |
10/26/2022 9:21:38 AM
| smorrison |
|
HOLD CO FOR PRIVATE PROVIDER CERT OF COMPLIANCE
| |
6/20/2022 9:21:33 AM
| slkling |
|
IMPACT FEE DUE
| 22-018273 |
3/21/2022 11:19:49 AM
| dwint |
|
INFO NOC-
| BK 5343 PG 1660 |
9/10/2021 10:28:26 AM
| krobshaw |
|
LANDSCAPE INSPECTION REQ
| |
6/24/2022 10:43:48 AM
| cgeorge |
|
PAID UTILITY RECEIPT REQUIRED
| JEA |
6/24/2022 12:47:16 PM
| bshugart |
|
REINSPECTION FEE
| 22-042681 |
6/24/2022 12:47:04 PM
| dwint |
|
REINSPECTION FEE
| 22-042681 |
6/24/2022 12:47:04 PM
| dwint |
|
REINSPECTION FEE
| 22-042681 |
6/24/2022 12:47:04 PM
| dwint |
|
REINSPECTION FEE
| 62300061 601 4/4/2023 $55 |
5/9/2023 2:18:59 PM
| dlyons |
|
TERMITE BOND CO
| APEX PEST CONTROL / SOIL |
9/13/2021 2:01:45 PM
| ktaing |
|
TERMITE PROTECTION CERT OF COMPL
| |
6/13/2022 3:55:14 PM
| clschmermund |
|
HOLD 109 FRAMING FOR FIRE PUMP
| REQ BY FP01 |
1/7/2022 12:08:09 PM
| VVitori |
|
HOLD 109 FOR IN BUILDING RADIO TEST PAPERWORK REVISION
| TEST COMPLETED AND PRELIM REPORT SUBMITED. |
6/16/2022 12:21:04 PM
| agedris |
|
HOLD 105 FRAMING FOR SMOKE CONTROL ENGINEERING ANALYSIS
| SEE FIRE COMMENT 5 |
6/16/2022 12:32:01 PM
| VVitori |
|
HOLD FINAL C/O FOR BDA REPORT
| FAILED TEST REPORT RECIEVED BDA SYSTEM HOLD ADDED |
7/13/2022 3:42:30 PM
| agedris |
|
HOLD FIRE FINAL FOR SMOKE CONTROL PERMIT/FINAL TEST
| REMOVE HOLD PER A. GEDRIS |
7/10/2023 12:19:21 PM
| dlyons |
|
HOLD 109 FRAMING FOR DIESEL GEN FUEL TANK PERMIT
| REVSION FOR GENERATOR AS FUTURE NOT IN CURRENT SCOPE |
6/14/2022 11:01:55 AM
| agedris |
|
HOLD FIRE FINAL FOR BDA SYSTEM PERMIT
| |
1/4/2023 10:42:34 AM
| dlyons |