|
7th Edition FBC (2020)
| |
| |
|
EARLY POWER LETTER REC'D
| |
9/27/2022 3:41:50 PM
| slkling |
|
ENGINEER ELEVATION CERTIFICATION
| |
8/17/2022 12:46:12 PM
| mthomas |
|
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL
| |
11/15/2022 4:09:43 PM
| BOCC |
|
IMPACT FEE DUE
| 22-067591 |
10/21/2022 7:32:18 AM
| nbrad |
|
INFO NOC-
| BK 5610 PG 1766 |
8/9/2022 10:01:26 AM
| slkling |
|
LANDSCAPE INSPECTION REQ
| |
3/31/2023 10:37:33 AM
| |
|
LOT GRADING INSP REQ PRIOR C/O
| |
4/17/2023 2:19:43 PM
| |
|
METER CAN INSPECTION
| |
10/3/2022 10:54:08 AM
| air |
|
PAID UTILITY RECEIPT REQUIRED
| SJCUD |
8/31/2022 9:17:15 AM
| slkling |
|
SOLID WASTE FEE DUE
| 22-050175 |
7/28/2022 11:09:20 AM
| kturn |
|
TERMITE BOND CO
| TURNER - WOOD |
7/27/2022 10:38:32 AM
| khanson |
|
TERMITE PROTECTION CERT OF COMPL
| |
4/24/2023 11:02:28 AM
| bshugart |