|
7th Edition FBC (2020)
| |
| |
|
EARLY POWER LETTER REC'D
| |
4/14/2023 8:18:19 AM
| cgalloway |
|
ENGINEER ELEVATION CERTIFICATION
| |
2/15/2023 10:10:59 AM
| nbradley |
|
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL
| |
11/15/2022 4:09:43 PM
| BOCC |
|
IMPACT FEE DUE
| 23-028481 |
5/24/2023 7:47:37 AM
| nbrad |
|
INFO NOC-
| BK 5594 PG 1936 |
7/13/2022 11:25:51 AM
| slkling |
|
LANDSCAPE INSPECTION REQ
| |
8/16/2023 1:20:09 PM
| |
|
LOT GRADING INSP REQ PRIOR C/O
| |
8/24/2023 1:48:37 PM
| |
|
METER CAN INSPECTION
| |
4/14/2023 11:59:40 AM
| air |
|
PAID UTILITY RECEIPT REQUIRED
| SJCUD |
2/22/2023 4:03:02 PM
| khart |
|
SOLID WASTE FEE DUE
| 23-028628 |
5/24/2023 12:34:21 PM
| bshug |
|
TERMITE BOND CO
| TURNER; WOOD |
7/8/2022 3:58:26 PM
| bshugart |
|
TERMITE PROTECTION CERT OF COMPL
| |
8/29/2023 7:40:00 AM
| kcooper |