|
7th Edition FBC (2020)
| |
| |
|
EARLY POWER LETTER REC'D
| |
12/6/2022 3:06:06 PM
| cgalloway |
|
ENGINEER ELEVATION CERTIFICATION
| |
8/5/2022 10:50:57 AM
| mthomas |
|
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL
| |
6/23/2022 7:53:37 AM
| kallen |
|
IMPACT FEE DUE
| 22-069596 |
11/1/2022 9:51:45 AM
| kalle |
|
INFO NOC-
| BK 5594 PG 1934 |
7/13/2022 11:25:02 AM
| slkling |
|
LOT GRADING INSP REQ PRIOR C/O
| |
5/11/2023 3:54:43 PM
| |
|
METER CAN INSPECTION
| |
12/7/2022 1:47:11 PM
| air |
|
PAID UTILITY RECEIPT REQUIRED
| SJCUD |
7/11/2022 2:03:43 PM
| slkling |
|
SOLID WASTE FEE DUE
| 22-045207 |
7/7/2022 9:16:37 AM
| alosc |
|
TERMITE BOND CO
| TURNER; WOOD |
7/6/2022 11:03:28 AM
| ccontestabile |
|
TERMITE PROTECTION CERT OF COMPL
| |
5/11/2023 1:32:41 PM
| bshugart |