|
7th Edition FBC (2020)
| |
| |
|
EARLY POWER LETTER REC'D
| |
5/19/2023 11:08:48 AM
| ecannon |
|
ENGINEER ELEVATION CERTIFICATION
| |
2/15/2023 10:10:17 AM
| nbradley |
|
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL
| |
11/17/2022 3:47:34 PM
| BOCC |
|
IMPACT FEE DUE
| 23-027179 |
5/18/2023 7:33:36 AM
| dwint |
|
INFO NOC-
| 5605/1770 |
1/26/2023 9:08:37 AM
| kturner |
|
LANDSCAPE INSPECTION REQ
| |
6/27/2023 12:42:14 PM
| |
|
LOT GRADING INSP REQ PRIOR C/O
| |
6/29/2023 10:55:51 AM
| |
|
METER CAN INSPECTION
| |
3/15/2023 2:59:38 PM
| air |
|
PAID UTILITY RECEIPT REQUIRED
| JEA |
2/10/2023 9:41:38 AM
| ecannon |
|
SOLID WASTE FEE DUE
| 22-049397 |
7/26/2022 7:44:35 AM
| khans |
|
TERMITE BOND CO
| TUR |
7/25/2022 2:44:04 PM
| khanson |
|
TERMITE PROTECTION CERT OF COMPL
| |
6/28/2023 8:46:06 AM
| jcrodriguez |