|
7th Edition FBC (2020)
| |
| |
|
EARLY POWER LETTER REC'D
| |
10/18/2022 2:13:40 PM
| slkling |
|
ENGINEER ELEVATION CERTIFICATION
| |
8/17/2022 7:28:44 AM
| kallen |
|
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL
| |
7/27/2022 4:24:27 PM
| BOCC |
|
IMPACT FEE DUE
| 22-055423 |
8/22/2022 10:22:40 AM
| kalle |
|
INFO NOC-
| 2572;146 |
7/11/2022 10:48:24 AM
| bbonfanti |
|
LANDSCAPE INSPECTION REQ
| |
2/16/2023 3:29:49 PM
| |
|
LOT GRADING INSP REQ PRIOR C/O
| |
1/27/2023 11:25:07 AM
| |
|
METER CAN INSPECTION
| |
10/19/2022 9:01:53 AM
| air |
|
PAID UTILITY RECEIPT REQUIRED
| JEA- ACCETANCE LETTER |
7/8/2022 11:19:05 AM
| bshugart |
|
REINSPECTION FEE
| 23-006950 |
2/8/2023 12:34:46 PM
| bshug |
|
REINSPECTION FEE
| 23-008365 |
2/15/2023 3:08:04 PM
| ccont |
|
SOLID WASTE FEE DUE
| 22-045582 |
7/8/2022 11:13:56 AM
| bshug |
|
TERMITE BOND CO
| HOMETEAM; BAIT |
7/8/2022 11:10:01 AM
| bshugart |
|
TERMITE PROTECTION CERT OF COMPL
| |
2/3/2023 11:24:55 AM
| kturner |