|
7th Edition FBC (2020)
| |
| |
|
EARLY POWER LETTER REC'D
| |
2/28/2023 4:24:25 PM
| bshugart |
|
ENGINEER ELEVATION CERTIFICATION
| |
9/19/2022 9:32:51 AM
| mthomas |
|
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL
| |
12/8/2022 9:48:23 AM
| BOCC |
|
IMPACT FEE DUE
| 23-004699 |
1/27/2023 8:43:05 AM
| nbrad |
|
INFO NOC-
| 5579;1966 |
7/7/2022 2:40:56 PM
| bbonfanti |
|
LANDSCAPE INSPECTION REQ
| |
3/20/2023 10:15:02 AM
| |
|
LOT GRADING INSP REQ PRIOR C/O
| |
3/20/2023 3:06:39 PM
| |
|
METER CAN INSPECTION
| |
2/23/2023 12:53:19 PM
| air |
|
PAID UTILITY RECEIPT REQUIRED
| JEA |
11/17/2022 2:45:05 PM
| slkling |
|
SOLID WASTE FEE DUE
| 22-043619 |
6/29/2022 10:47:24 AM
| bshug |
|
TERMITE BOND CO
| B&B - WOOD |
6/27/2022 8:27:00 AM
| khanson |
|
TERMITE PROTECTION CERT OF COMPL
| |
3/23/2023 12:02:22 PM
| bshugart |