SJC Home
DescriptionInputDateWho
7th Edition FBC (2020)    
EARLY POWER LETTER REC'D   10/27/2022 3:45:07 PM slkling
ENGINEER ELEVATION CERTIFICATION   6/24/2022 8:30:52 AM dwintons
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL   6/10/2022 2:46:31 PM BOCC
IMPACT FEE DUE 22-053786 8/15/2022 9:15:32 AM Lexis
INFO NOC- 5578//35 6/14/2022 8:03:28 AM kcooper
LANDSCAPE INSPECTION REQ   2/2/2023 9:39:23 AM  
LOT GRADING INSP REQ PRIOR C/O   2/1/2023 1:20:59 PM  
METER CAN INSPECTION   10/28/2022 2:47:28 PM air
PAID UTILITY RECEIPT REQUIRED SJCUD 5/23/2022 8:06:44 AM bmsmith
SOLID WASTE FEE DUE 22-034467 5/20/2022 2:19:44 PM Lexis
TERMITE BOND CO TURNER;BAIT 5/20/2022 1:26:59 PM kcooper
TERMITE PROTECTION CERT OF COMPL   2/23/2023 9:13:56 AM ccontestabile