SJC Home
DescriptionInputDateWho
7th Edition FBC (2020)    
EARLY POWER LETTER REC'D   9/19/2022 11:02:33 AM slkling
ENGINEER ELEVATION CERTIFICATION   7/27/2022 9:39:25 AM kallen
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL   4/21/2022 8:25:57 AM ttrezza
IMPACT FEE DUE 22-051768 8/4/2022 1:44:18 PM mthom
INFO NOC- 5589;260 6/30/2022 1:52:25 PM bbonfanti
LANDSCAPE INSPECTION REQ   1/17/2023 12:54:59 PM  
LOT GRADING INSP REQ PRIOR C/O   1/17/2023 1:41:43 PM  
METER CAN INSPECTION   9/16/2022 12:11:56 PM air
PAID UTILITY RECEIPT REQUIRED SJCUD 9/14/2022 9:39:42 AM slkling
SOLID WASTE FEE DUE 22-039564 6/13/2022 11:38:34 AM ecann
TERMITE BOND CO BRANDON;WOOD 5/10/2022 9:37:45 AM kcooper
TERMITE PROTECTION CERT OF COMPL TURNER; BAIT 10/26/2022 10:02:13 AM bmsmith