SJC Home
DescriptionInputDateWho
7th Edition FBC (2020)    
EARLY POWER LETTER REC'D   10/18/2022 11:17:11 AM slkling
ENGINEER ELEVATION CERTIFICATION   7/20/2022 2:16:32 PM dwintons
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL   4/11/2023 10:28:19 AM BOCC
IMPACT FEE DUE 22-051770 8/4/2022 1:47:48 PM mthom
INFO NOC- 5585/404 6/24/2022 4:06:34 PM cgalloway
LANDSCAPE INSPECTION REQ   4/4/2023 9:55:54 AM  
LOT GRADING INSP REQ PRIOR C/O   4/25/2023 8:50:05 AM  
METER CAN INSPECTION   10/18/2022 8:30:25 AM air
PAID UTILITY RECEIPT REQUIRED SJCUD 4/13/2023 1:56:09 PM bshugart
SOLID WASTE FEE DUE 22-033327 5/17/2022 12:28:05 PM alosc
TERMITE BOND CO TURNER; WOOD 5/6/2022 1:42:33 PM ccontestabile
TERMITE PROTECTION CERT OF COMPL   8/18/2022 1:10:34 PM slkling