SJC Home
DescriptionInputDateWho
7th Edition FBC (2020)    
EARLY POWER LETTER REC'D   10/19/2022 1:46:28 PM slkling
ENGINEER ELEVATION CERTIFICATION   7/20/2022 2:13:59 PM dwintons
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL   4/11/2023 10:28:19 AM BOCC
IMPACT FEE DUE 22-051773 8/4/2022 1:52:18 PM mthom
INFO NOC- 5585/403 6/24/2022 4:07:09 PM cgalloway
LANDSCAPE INSPECTION REQ   4/4/2023 9:56:05 AM  
LOT GRADING INSP REQ PRIOR C/O   4/27/2023 12:29:07 PM  
METER CAN INSPECTION   10/20/2022 9:17:44 AM air
PAID UTILITY RECEIPT REQUIRED SJCUD 4/13/2023 1:55:29 PM bshugart
SOLID WASTE FEE DUE 22-033334 5/17/2022 12:35:30 PM alosc
TERMITE BOND CO TURNER;WOOD 5/5/2022 9:37:29 AM kcooper
TERMITE PROTECTION CERT OF COMPL   8/18/2022 1:10:09 PM slkling