|
7th Edition FBC (2020)
| |
| |
|
EARLY POWER LETTER REC'D
| |
9/16/2022 9:33:30 AM
| slkling |
|
ENGINEER ELEVATION CERTIFICATION
| |
7/20/2022 2:12:50 PM
| dwintons |
|
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL
| |
4/11/2023 10:28:19 AM
| BOCC |
|
IMPACT FEE DUE
| 22-051774 |
8/4/2022 1:54:26 PM
| mthom |
|
INFO NOC-
| 5585/402 |
6/24/2022 4:07:48 PM
| cgalloway |
|
LANDSCAPE INSPECTION REQ
| |
4/4/2023 9:55:44 AM
| |
|
LOT GRADING INSP REQ PRIOR C/O
| |
4/4/2023 8:41:05 AM
| |
|
METER CAN INSPECTION
| |
10/19/2022 10:25:07 AM
| air |
|
PAID UTILITY RECEIPT REQUIRED
| SJCUD |
4/13/2023 1:54:50 PM
| bshugart |
|
SOLID WASTE FEE DUE
| 22-033335 |
5/17/2022 12:36:47 PM
| alosc |
|
TERMITE BOND CO
| TURNER;WOOD |
5/4/2022 10:01:09 AM
| kcooper |
|
TERMITE PROTECTION CERT OF COMPL
| |
8/18/2022 1:09:43 PM
| slkling |