SJC Home
DescriptionInputDateWho
7th Edition FBC (2020)    
EARLY POWER LETTER REC'D   9/19/2022 10:57:24 AM slkling
ENGINEER ELEVATION CERTIFICATION   7/20/2022 2:10:15 PM dwintons
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL   4/11/2023 10:28:19 AM BOCC
IMPACT FEE DUE 22-051782 8/4/2022 2:01:25 PM mthom
INFO NOC- 5580;1746 6/17/2022 2:18:22 PM bbonfanti
LANDSCAPE INSPECTION REQ   4/4/2023 9:55:35 AM  
LOT GRADING INSP REQ PRIOR C/O   4/4/2023 8:40:56 AM  
METER CAN INSPECTION   9/19/2022 8:53:33 AM air
PAID UTILITY RECEIPT REQUIRED SJCUD 4/13/2023 1:53:43 PM bshugart
SOLID WASTE FEE DUE 22-033330 5/17/2022 12:29:25 PM alosc
TERMITE BOND CO TURNER; WOOD 5/13/2022 11:02:20 AM slkling
TERMITE PROTECTION CERT OF COMPL   8/18/2022 1:08:58 PM slkling