SJC Home
DescriptionInputDateWho
7th Edition FBC (2020)    
EARLY POWER LETTER REC'D   9/14/2022 10:46:25 AM slkling
ENGINEER ELEVATION CERTIFICATION   7/20/2022 2:08:39 PM dwintons
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL   4/11/2023 10:28:19 AM BOCC
IMPACT FEE DUE 22-051783 8/4/2022 2:03:14 PM mthom
INFO NOC- 5580;1745 6/17/2022 2:17:35 PM bbonfanti
LANDSCAPE INSPECTION REQ   4/4/2023 9:55:25 AM  
LOT GRADING INSP REQ PRIOR C/O   4/4/2023 8:39:35 AM  
METER CAN INSPECTION   9/13/2022 9:02:01 AM air
PAID UTILITY RECEIPT REQUIRED SJCUD 4/13/2023 1:51:54 PM bshugart
SOLID WASTE FEE DUE 22-044291 7/1/2022 8:50:49 AM cgall
TERMITE BOND CO TURNER;WOOD 5/4/2022 2:37:46 PM kcooper
TERMITE PROTECTION CERT OF COMPL   8/18/2022 1:08:15 PM slkling