DescriptionInputDateWho
7th Edition FBC (2020)    
EARLY POWER LETTER REC'D   9/14/2022 10:48:17 AM slkling
ENGINEER ELEVATION CERTIFICATION   7/20/2022 2:07:21 PM dwintons
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL   4/11/2023 10:28:19 AM BOCC
IMPACT FEE DUE 22-051784 8/4/2022 2:04:46 PM mthom
INFO NOC- 5576;83 6/9/2022 3:07:59 PM bbonfanti
LANDSCAPE INSPECTION REQ   4/4/2023 9:55:16 AM  
LOT GRADING INSP REQ PRIOR C/O   4/4/2023 8:39:23 AM  
METER CAN INSPECTION   9/13/2022 8:59:59 AM air
PAID UTILITY RECEIPT REQUIRED SJCUD 4/13/2023 1:51:33 PM bshugart
SOLID WASTE FEE DUE 22-033331 5/17/2022 12:30:38 PM alosc
TERMITE BOND CO TURNER;WOOD 5/4/2022 9:55:53 AM kcooper