7th Edition FBC (2020)
| |
| |
|
EARLY POWER LETTER REC'D
| |
9/14/2022 10:48:17 AM
| slkling |
|
ENGINEER ELEVATION CERTIFICATION
| |
7/20/2022 2:07:21 PM
| dwintons |
|
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL
| |
4/11/2023 10:28:19 AM
| BOCC |
|
IMPACT FEE DUE
| 22-051784 |
8/4/2022 2:04:46 PM
| mthom |
|
INFO NOC-
| 5576;83 |
6/9/2022 3:07:59 PM
| bbonfanti |
|
LANDSCAPE INSPECTION REQ
| |
4/4/2023 9:55:16 AM
| |
|
LOT GRADING INSP REQ PRIOR C/O
| |
4/4/2023 8:39:23 AM
| |
|
METER CAN INSPECTION
| |
9/13/2022 8:59:59 AM
| air |
|
PAID UTILITY RECEIPT REQUIRED
| SJCUD |
4/13/2023 1:51:33 PM
| bshugart |
|
SOLID WASTE FEE DUE
| 22-033331 |
5/17/2022 12:30:38 PM
| alosc |
|
TERMITE BOND CO
| TURNER;WOOD |
5/4/2022 9:55:53 AM
| kcooper |
|
TERMITE PROTECTION CERT OF COMPL
| |
8/18/2022 1:07:49 PM
| slkling |