SJC Home
DescriptionInputDateWho
7th Edition FBC (2020)    
EARLY POWER LETTER REC'D   10/18/2022 11:24:46 AM slkling
ENGINEER ELEVATION CERTIFICATION   8/18/2022 3:52:30 PM mthomas
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL   4/13/2022 2:21:07 PM ttrezza
IMPACT FEE DUE 22-051765 8/4/2022 1:41:04 PM mthom
INFO NOC- 5585/518 6/24/2022 4:19:11 PM cgalloway
LANDSCAPE INSPECTION REQ   2/9/2023 8:46:25 AM  
LOT GRADING INSP REQ PRIOR C/O   2/8/2023 2:23:49 PM  
METER CAN INSPECTION   10/18/2022 10:45:11 AM air
PAID UTILITY RECEIPT REQUIRED SJCUD 9/14/2022 9:41:12 AM slkling
SOLID WASTE FEE DUE 22-039561 6/13/2022 11:37:28 AM ecann
TERMITE BOND CO BRANDON;WOOD 5/5/2022 8:41:42 AM kcooper
TERMITE PROTECTION CERT OF COMPL TURNER; BAIT 10/26/2022 9:57:28 AM bmsmith