|
7th Edition FBC (2020)
| |
| |
|
EARLY POWER LETTER REC'D
| |
7/27/2022 10:57:49 AM
| cgalloway |
|
ENGINEER ELEVATION CERTIFICATION
| |
7/7/2022 11:18:28 AM
| dwintons |
|
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL
| |
4/22/2022 3:26:25 PM
| kmauch |
|
IMPACT FEE DUE
| 22-055575 |
8/22/2022 3:46:05 PM
| Lexis |
|
INFO NOC-
| 5535//1117 |
5/4/2022 9:38:35 AM
| kcooper |
|
LANDSCAPE INSPECTION REQ
| |
2/9/2023 10:28:35 AM
| |
|
LOT GRADING INSP REQ PRIOR C/O
| |
2/7/2023 10:49:56 AM
| |
|
METER CAN INSPECTION
| |
7/28/2022 11:55:30 AM
| air |
|
PAID UTILITY RECEIPT REQUIRED
| JEA |
5/4/2022 9:38:25 AM
| kcooper |
|
SOLID WASTE FEE DUE
| 22-030077 |
5/4/2022 2:31:33 PM
| Lexis |
|
TERMITE BOND CO
| TURNER;BAIT |
5/4/2022 9:38:42 AM
| kcooper |
|
TERMITE PROTECTION CERT OF COMPL
| |
2/3/2023 9:38:50 AM
| cgalloway |