|
7th Edition FBC (2020)
| |
| |
|
EARLY POWER LETTER REC'D
| |
8/31/2022 3:39:05 PM
| slkling |
|
ENGINEER ELEVATION CERTIFICATION
| |
7/5/2022 2:32:17 PM
| dwintons |
|
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL
| |
4/8/2022 6:53:58 AM
| amcbroom |
|
IMPACT FEE DUE
| 22-042055 |
6/22/2022 1:56:00 PM
| dwint |
|
INFO NOC-
| BK:5562 PG:1269 |
5/20/2022 2:13:41 PM
| bmsmith |
|
LANDSCAPE INSPECTION REQ
| |
12/16/2022 10:39:36 AM
| |
|
LOT GRADING INSP REQ PRIOR C/O
| |
12/16/2022 10:39:48 AM
| |
|
METER CAN INSPECTION
| |
9/1/2022 3:02:10 PM
| air |
|
PAID UTILITY RECEIPT REQUIRED
| SJCUD |
9/13/2022 3:47:49 PM
| slkling |
|
SOLID WASTE FEE DUE
| 22-031738 |
5/11/2022 9:33:05 AM
| cgall |
|
TERMITE BOND CO
| BRANDON;WOOD |
4/29/2022 11:01:48 AM
| kcooper |
|
TERMITE PROTECTION CERT OF COMPL
| |
7/18/2022 9:27:05 AM
| slkling |