|
7th Edition FBC (2020)
| |
| |
|
EARLY POWER LETTER REC'D
| |
8/26/2022 1:34:17 PM
| slkling |
|
ENGINEER ELEVATION CERTIFICATION
| |
6/24/2022 4:04:54 PM
| dwintons |
|
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL
| |
10/31/2022 3:13:38 PM
| BOCC |
|
IMPACT FEE DUE
| 22-051754 |
8/4/2022 1:31:55 PM
| mthom |
|
INFO NOC-
| 5521;724 |
6/7/2022 1:56:48 PM
| bbonfanti |
|
LANDSCAPE INSPECTION REQ
| |
1/4/2023 11:42:18 AM
| |
|
LOT GRADING INSP REQ PRIOR C/O
| |
1/4/2023 12:21:14 PM
| |
|
METER CAN INSPECTION
| |
8/29/2022 10:32:34 AM
| air |
|
PAID UTILITY RECEIPT REQUIRED
| JEA |
4/7/2022 1:34:35 PM
| kcooper |
|
SOLID WASTE FEE DUE
| 22-026018 |
4/19/2022 12:07:47 PM
| dwint |
|
TERMITE BOND CO
| TURNER;WOOD |
4/7/2022 1:34:56 PM
| kcooper |
|
TERMITE PROTECTION CERT OF COMPL
| |
11/3/2022 2:54:33 PM
| slkling |