7th Edition FBC (2020)
| |
| |
|
EARLY POWER LETTER REC'D
| |
9/8/2022 9:47:29 AM
| slkling |
|
ENGINEER ELEVATION CERTIFICATION
| |
7/11/2022 3:52:46 PM
| dwintons |
|
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL
| |
3/15/2022 8:22:34 AM
| amcbroom |
|
IMPACT FEE DUE
| 22-047380 |
7/15/2022 1:34:46 PM
| dwint |
|
INFO NOC-
| 5565;1516 |
5/26/2022 9:37:54 AM
| ecannon |
|
LANDSCAPE INSPECTION REQ
| |
1/20/2023 11:10:26 AM
| |
|
LOT GRADING INSP REQ PRIOR C/O
| |
2/7/2023 8:45:33 AM
| |
|
METER CAN INSPECTION
| |
9/8/2022 9:40:57 AM
| air |
|
PAID UTILITY RECEIPT REQUIRED
| SJCUD |
9/16/2022 1:28:27 PM
| slkling |
|
SOLID WASTE FEE DUE
| 22-020801 |
3/30/2022 11:06:18 AM
| kcoop |
|
TERMITE BOND CO
| TURNER;WOOD |
3/30/2022 11:06:02 AM
| kcooper |
|
TERMITE PROTECTION CERT OF COMPL
| |
8/5/2022 3:05:16 PM
| slkling |