|
7th Edition FBC (2020)
| |
| |
|
EARLY POWER LETTER REC'D
| |
9/14/2022 10:39:23 AM
| slkling |
|
ENGINEER ELEVATION CERTIFICATION
| |
7/11/2022 3:51:21 PM
| dwintons |
|
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL
| |
3/15/2022 8:19:40 AM
| amcbroom |
|
IMPACT FEE DUE
| 22-047381 |
7/15/2022 1:35:59 PM
| dwint |
|
INFO NOC-
| 5565;1515 |
5/26/2022 9:37:14 AM
| ecannon |
|
LANDSCAPE INSPECTION REQ
| |
11/23/2022 10:19:50 AM
| |
|
LOT GRADING INSP REQ PRIOR C/O
| |
12/15/2022 1:42:59 PM
| |
|
METER CAN INSPECTION
| |
9/14/2022 9:36:04 AM
| air |
|
PAID UTILITY RECEIPT REQUIRED
| SJCUD |
9/16/2022 1:28:00 PM
| slkling |
|
SOLID WASTE FEE DUE
| 22-022760 |
4/6/2022 1:16:51 PM
| kcoop |
|
TERMITE BOND CO
| TURNER;WOOD |
4/6/2022 1:16:15 PM
| kcooper |
|
TERMITE PROTECTION CERT OF COMPL
| |
8/5/2022 3:04:43 PM
| slkling |