DescriptionInputDateWho
7th Edition FBC (2020)    
EARLY POWER LETTER REC'D   9/8/2022 11:10:11 AM slkling
FEMA FORM REQUIRED A ZONE BFE-24.3' TOP OF FORM BOARDS-27' LAG-25.7' 5/25/2022 3:58:27 PM ajordan
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL   3/14/2022 10:10:59 AM kallen
HOLD C/O: ORIGINAL FINISHED CONST FEMA BFE-24.3' MER-25.3' FFE-27' GAR-26.6' EQUIP-26.6' 11/8/2022 9:26:19 AM ajordan
IMPACT FEE DUE 22-025325 4/15/2022 1:37:26 PM Lexis
INFO NOC- 5508//1450 4/12/2022 12:52:15 PM kcooper
LANDSCAPE INSPECTION REQ   10/21/2022 11:20:51 AM  
LOT GRADING INSP REQ PRIOR C/O   11/3/2022 10:39:18 AM  
METER CAN INSPECTION   9/7/2022 2:27:32 PM air
PAID UTILITY RECEIPT REQUIRED SJCUD 4/14/2022 1:37:45 PM bshugart
SOLID WASTE FEE DUE 22-024453 4/12/2022 2:57:32 PM Lexis
TERMITE BOND CO MASSEY;WOOD 4/12/2022 12:52:21 PM kcooper
TERMITE PROTECTION CERT OF COMPL   10/7/2022 1:06:41 PM slkling