7th Edition FBC (2020)
| |
| |
|
EARLY POWER LETTER REC'D
| |
12/29/2022 3:53:45 PM
| slkling |
|
FEMA FORM REQUIRED
| AE-7, X-NA |
6/28/2022 12:50:40 PM
| dwintons |
|
HOLD C/O: ORIGINAL FINISHED CONST FEMA
| BFE-6' MER-7' FFE-7.45' GAR-5.78' EQUIP-7.12' |
5/2/2024 3:54:14 PM
| jbrown |
|
IMPACT FEE DUE
| 23-018948 |
4/11/2023 10:56:49 AM
| nbrad |
|
IMPACT FEE DUE Zero Out
| 23-018948 |
4/11/2023 10:56:49 AM
| nbrad |
|
INFO NOC-
| 5510/1561 |
5/19/2022 4:18:04 PM
| cgalloway |
|
LANDSCAPE INSPECTION REQ
| |
4/19/2024 10:38:37 AM
| |
|
LOT GRADING INSP REQ PRIOR C/O
| |
4/22/2024 3:43:10 PM
| |
|
METER CAN INSPECTION
| |
12/30/2022 11:40:03 AM
| air |
|
PAID UTILITY RECEIPT REQUIRED
| SJCUD-SEWER |
4/24/2024 3:58:47 PM
| jcrodriguez |
|
PAID UTILITY RECEIPT REQUIRED
| JEA-WATER |
4/24/2024 3:44:27 PM
| jcrodriguez |
|
SOLID WASTE FEE DUE
| ANNUAL ASSESSMENT $230.00 |
2/8/2022 11:02:03 AM
| ccontestabile |
|
SWALE/CULVERT FINAL INSP REQ
| |
4/9/2024 4:48:02 PM
| air |
|
TERMITE BOND CO
| MCCALL; SOIL |
2/8/2022 10:59:59 AM
| ccontestabile |
|
TERMITE PROTECTION CERT OF COMPL
| |
4/24/2024 3:38:30 PM
| jcrodriguez |
|
HOLD FINALS FOR METAL ROOF PERMIT.
| P#12308278 |
6/21/2023 2:19:35 PM
| khanson |
|
HOLD INSPECTION 100 FOR REVISED ENERGY TO METAL ROOF
| |
9/1/2023 2:25:23 PM
| jedwards |
|
HOLD INSP 109 FOR SPRAY FOAM AFFIDAVIT.
| |
11/27/2023 7:45:56 AM
| tgoodson |