|
7th Edition FBC (2020)
| |
| |
|
BAY WIND/FPLACE/EAVES/MAX 3 FT. PROJECTION
| |
| |
|
EARLY POWER LETTER REC'D
| |
11/22/2022 1:11:24 PM
| slkling |
|
EXISTING RESIDENCE TO BE REMOVED PRIOR TO C/O
| |
9/27/2023 12:23:04 PM
| khart |
|
FEMA FORM REQUIRED
| FZ - AE BFE - 7' FFE - 12.1' GARAGE TO BE 9' OK |
5/6/2022 3:56:06 PM
| wwoodward |
|
HOLD C/O: ORIGINAL FINISHED CONST FEMA
| BFE-7' MER-8' FFE-12.14' GAR-9' EQUIP-8.90' |
10/31/2023 2:45:36 PM
| ajordan |
|
IMPACT FEE DUE
| 22-072676 |
11/18/2022 10:15:33 AM
| Lexis |
|
INFO NOC-
| BK 5504 PG 762 |
3/1/2022 12:39:11 PM
| bshugart |
|
LANDSCAPE INSPECTION REQ
| |
10/27/2023 1:04:49 PM
| |
|
LOT GRADING INSP REQ PRIOR C/O
| |
10/26/2023 10:36:54 AM
| |
|
METER CAN INSPECTION
| |
11/14/2022 1:02:25 PM
| air |
|
PAID UTILITY RECEIPT REQUIRED
| SJCUD-SEWER |
2/25/2022 8:05:59 AM
| ccontestabile |
|
SOLID WASTE FEE DUE
| 22-012860 |
2/25/2022 1:44:20 PM
| dwint |
|
TERMITE BOND CO
| TAYLOR; SOIL |
2/25/2022 8:01:05 AM
| ccontestabile |
|
TERMITE PROTECTION CERT OF COMPL
| |
7/13/2023 4:09:24 PM
| bshugart |